CHRISTIAN SCIENCE PLAZA FOR NORTHEASTERN UNIVERSITY
This project renovated the first floor of 101 Belvidere Street in Boston, The Colonnade Building at the Christian Science Plaza on behalf of Northeastern University. This high-profile renovation of a brutalist building included millwork, doors, flooring, lighting, electrical, and plumbing. The budget was $460k and the architect was Northeastern University. The project was completed in 8 weeks.
BEFORE
AFTER
GAZE OPTICAL
This project renovated 214 Arsenal St., Watertown, MA from an empty tenant shell to an optometrist office and retail store, Gaze Optical. The interior renovation included a concrete slab, MEFP modifications, walls and ceilings, doors, flooring, painting, and millwork. The budget was $292,000. The architect was Joe the Architect of Medford, MA. Project completed in January 2022 in 4 months.
BEFFORE
AFTER
TOP SHELF COOKIES
This project renovated 516 Gallivan Blvd., Boston, MA from a former pizza restaurant into a cookie shop, Top Shelf Cookies. The interior renovation included MEFP modifications, walls and ceilings, flooring, painting, kitchen equipment installation, and millwork. The budget was $126,000. The architect was Joe the Architect of Medford, MA. Project completed in May 2021 in 4 months.
BEFORE
AFTER
TREE HOUSE CANNABIS DISPENSARY
This project renovated 61Silva Ln, Dracut, MA from unoccupied tenant space into a retail cannabis dispensary, Treehouse. The interior renovation included MEFPs, walls and ceilings, doors, floor polishing, paintings, millwork, custom lighting, and security. Flock also contracted and managed the MEP engineering. The budget was $550,000. The architect was Fishbrook Design Group of Haverhill, MA. Project completed in July 2021 in 6 months.
BEFORE
AFTER
STEM DISPENSARY
This project renovated 124 Washington St., Haverhill, MA from a former social club into a retail cannabis dispensary, STEM. The project included complete sitework including new utilities and sidewalks. The interior renovation included demolition, abatement, new MEFPs, structural modifications, walls and ceilings, doors, flooring, painting, millwork, and storefront. The project included historic restoration including the original tin ceiling and heartwood floors, and historic replica storefront. Flock also contracted and managed the MEP engineering. The budget was $598,000. The architect was Fishbrook Design Group of Haverhill, MA. Project completed in January 2020 in 9 months.